ÏãåúÖ±²¥

East Side Access CH057

Harold Structures Part 3

Project Details

TUTOR PERINI AFFILIATES

Tutor Perini Civil
Prime Contractor
Contract Amount: $63 Million

/
Scant Piles Subcontractor
Contract Amount: $2.8 Million

OWNER
NYC Metropolitan Transportation Authority

LOCATION
New York, NY

ARCHITECT
GEC (PB/STV/Parsons)

COMPLETION
2017

Project Description

This project entailed the demolition and removal of a tunnel boring machine; several bridges; a substation structure; and catenary and signal power support structures. Associated with this demolition was the mitigation of contaminated and hazardous material. Included was the construction of retaining walls; bridges; ballasted track; foundations and steel structures for catenary support and signals; ductbanks; utilities; trackwork; switches; electrical work; snowmelter substation; and all related environmental, dewatering, relocation of utilities, and support of excavation and monitoring equipment for same.

The work included two retaining walls, 740-foot cut and cover tunnel for Track D approach structure,Ìýone-half mile of trough installation, demolition and replacement of 48th St Rail Bridge, track and switch installation, and secant piles for support of the below-ground rail lines.

Ìý

RELATED PROJECTS
ESAÌýCH053 (Harold Structures Part 1)
ESAÌýCH054A (Harold Structures Part 2)
ESAÌýCH061A (Michaels – Track A Cut & Cover Structures)
ESAÌýCM005 (Manhattan South Structures)
ESAÌýCM006 (Manhattan North Structures)
ESAÌýCM007 (Grand Central Terminal Caverns)
ESA CM014B (Grand Central Terminal Concourse Facility and Fit-Out)
ESAÌýCQ031 (Queens Bored Tunnels)

ESAÌýCQ032 (Queens Structures and Plaza Substation)
ESAÌýCQ033 (Mid Day Storage Yard)
ESA CS086 (Systems Package No. 3)
ESAÌýCS179 (Systems Facilities Package No. 1)