East Side Access CS179

Systems Facilities Package No. 1

Project Details

TUTOR PERINI AFFILIATES

Tutor Perini Civil
Prime Contractor
Contract Amount: $878 Million


Electrical Subcontractor
Contract Amount: $593 Million

OWNER
NYC Metropolitan Transportation Authority

LOCATION
New York, NY

ARCHITECT
GEC (PB/STV/Parsons)

SIZE
12 Miles of Tunnels

COMPLETION
2021

Project Description

This contract provides for the design and build of electrical, mechanical, ventilation, and architectural work as follows: Electrical - communication systems, control systems, security systems, fire detection systems, power substations, metering equipment, switchgear, signal systems, lighting, public address systems, heaters, telephone systems, distributed antenna systems, data capture and reporting systems, traffic control systems, monitoring/maintenance equipment, and emergency generators; Mechanical - drainage pumps, fire standpipes, fire suppression equipment, and monorail/hoist equipment; Ventilation - fans, dampers, controls, and air conditioning systems; Architectural - doors, louvers, and handrails. Additional responsibilities include coordinating the work and requirements with those of the Long Island Railroad, Metro North Railroad, New York City Transit, New York and Atlantic Railroad, Amtrak, and New Jersey Transit.Ìý

The project includes 12 miles of tunnels, 11 ventilation facilities, 62 communication rooms, 79 tunnel ventilation fans, 11 miles of fire standpipe, 13 electrical substations, 29 communication systems, 380 miles of conduit, and 760 miles of cable.

Ìý

RELATED PROJECTS
ESAÌýCH053 (Harold Structures Part 1)
ESAÌýCH054A (Harold Structures Part 2)
ESAÌýCH057 (Harold Structures Part 3)
ESAÌýCH061A (Michaels – Track A Cut & Cover Structures)
ESAÌýCM005 (Manhattan South Structures)
ESAÌýCM006 (Manhattan North Structures)
ESAÌýCM007 (Grand Central Terminal Caverns)
ESA CM014B (Grand Central Terminal Concourse Facility and Fit-Out)
ESAÌýCQ031 (Queens Bored Tunnels)

ESAÌýCQ032 (Queens Structures and Plaza Substation)
ESAÌýCQ033 (Mid Day Storage Yard)
ESA CS086 (Systems Package No. 3)

Photo Credits: NYC MTA